BUIDLING WATER TRANSFER AND HCMC LEVEL 1 NETWORK IN PERIOD OF 2010 – 2020.
1. Requirement and current conditions
3.1. Requirement and current conditions
- Requirement: guarantte to supply 100% need of clean water of HCMC people
- Current conditions
+ to build new pipe systems
+ Difficult in building pipe systems through canals and connection
1.2. Masterplan:
- Draft general plan of HCMC water supply until 2025 designed by VIWASE in May 2008 (the final report)
1.3. Objective:
Guarantee to safe operation and supply clean water
1.4. Capacity, location, total area, construction items, land (based on draft design of Report on Construction investment and opening transfer system – HCMC level 1 network in period of 2010 – 2020 by VIWASE in June 2008).
- Estimated capacity:
+ to build water transfer pipe system and level 1 network : 90 km
+ to build step-up substation and reserve tank in An Phu Tay (Binh Chanh Dist.) and Long Thoi (Nha Be Dist.)
+ to build connection points to restructure the network
- Location: in Ho Chi Minh City.
1.5. Technology & condition
- to clear land and residential resettlement for 2 areas to locate step-up substation and reserve tank.
- to clear land to build pipe systems
1.6. Total investment capital, form of investment, time of investment
- Total investment capital: VND2,820 billion (based on draft design of Report on Construction investment and opening transfer system – HCMClevel 1 network in period of 2010 – 2020 by VIWASE in June 2008).
- Form of investment: ODA capital
- Time of investment: 2010 – 2020.
2. Procedures and contact
- Procedures of the project investment: doing Investment Report for approval (Group A project)
- Contact: Saigon Water Corporation