COMPONENT NO.5 PROJECT OF DRAINAGE AND POLLUTION TREATMENT AT THAM LUONG – BEN CAT – RACH NUOC LEN CHANNELS (PHASE 2)

Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2). Productivity: 150,000 m3/day night. Located at Tan Phu District.

PROJECT TYPE                       Infrastructure – Water treatment

 

PROJECT NAME                    

Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2).

Component project No.5: West Saigon Waste water treatment plant

 

LOCATION                              District Tan Phu

 

PROJECTED INVESTMENT   1,650 billion dong  (77.83 million USD)

 

INVESTMENT TYPE               BOT or BT (prefered BOT)

 

OBJECTIVES                           Wastewater treatment at the west of Saigon

 

GENERAL INFORMATION

Decision No.5754/QD-UBND dated 12/11/2012 of the People’s Committee on approving the list of BOT, BT projects calling for investment.

Productivity: 150,000 m3/day night

 

CONTACT AGENCY:

CENTER OF OPERATING THE CITY’S FLOOD FIGHTING PROGRAM

Address: 10 Tran Nhat Duat, Tan Dinh ward, District 1, Ho Chi Minh City

Tel: (84-8)3526.7497– (84-8)3526.7498 |  FAX: (84-8) 3526.7497– (84.8) 3526.7498