ELEVATED ROAD NO.2 (FROM JUNCTION WITH ROUTE NO.1 FOLLOWING TO HIEN THANH – LU GIA – BINH THOI – ROAD NO.3 TO RING ROAD 2)

Build the elevated axis whose direction is from city center to the West of the city

PROJECT TYPE                       Infrastructure – Bridge – Road

PROJECT NAME                     Elevated Road No.2 (from junction with Route No.1 following To Hien Thanh – Lu Gia – Binh Thoi – Road No.3 to Ring Road 2)

LOCATION                              District 10, 11,  District Binh Chanh

PROJECTED INVESTMENT   21,483 billion dong (1,023 million USD)

INVESTMENT TYPE               BOT or BOT combined BT (preferred BOT)

OBJECTIVES                           Build the elevated axis whose direction is from city center to the West of the city

GENERAL INFORMATION

Construction scale:

 + Entire length: 11.8 km

 + Width: 17.5 m

Decision No.631/QD-TTg of the Prime Minister: On the issuance of the national list of projects calling for foreign investment by 2020.

CONTACT AGENCY:

DEPARTMENT OF TRANSPORTATION  HO CHI MINH CITY

Address: 63 Ly Tu Trong Street, Ben Nghe, District 1, Ho Chi Minh city

Tel: 84.8.38290451