INTERNATIONAL UNIVERSITY URBAN AREA

Developing project system of social infrastructure, integrating the urban development space in commercial, public service and other works to create incentives contribute to accelerate the formation and development of urban area northwest of the city, form a complete urban space, synchronizing with modern functionality to create a better working environment, create a learning environment that meets international standards, create the best environment and provide a full range of facilities, recreation, entertainment etc. with respect to the natural condition.Business tax exemption for imported goods.

1.   Name of project: International university urban area

 

2.  Project management owner/ agency

2.1. Information about the project management owner / agency:

Name: North-West Metropolitan Area Authority Management Board

- Address: 86 Le Thanh Ton, District 1, HCM city

- Representative: Nguyen Van Thanh   - Position: Head of the board

- Phone: 08 38 228 223 - Fax: 08 38 249 108

2.2. Scope of activities / functions: North-West Metropolitan Area Authority Management Board

2.3.   Contact: North-West Metropolitan Area Authority Management Board

 

3. Objectives of the project

- Developing project system of social infrastructure, and integrate the urban development space is commercial, public service and other works.

-  Create  incentives  contribute  to  accelerate the formation and development of urban area northwest of the city. Form a complete urban space, synchronization, with modern functionality to meet the requirements including

+ Create a better working environment

+ Create a learning environment that meets international standards.

+ Create the best environment

+ Provide a full range of facilities, recreation, entertainment, ...

- Ensuring land use structure and organization of social infrastructure systems, technical infrastructure consistent with urban planning urban construction northwest of the city.

- Respect for the natural conditions, especially canals,   landscape   and   environment   of   the region-specific solutions designed to develop a reasonable plan.

- Create more green space, open space to improve the environment.

- To harmonize the relationship problems, especially major infrastructure connected with the functional areas left in urban area northwest of the city, the hotel area and Hoc Mon district, Long An Province.

 

4. Investment form: 100% foreign – owned capital.

5. Investment scale:

5.1. Estimated investment capital: 56,000 billion VND

5.2. Used land area: 923.88 ha

 

6. Project duration

6.1. Operation Duration (year): 50 years

6.2. Estimated time to operate: January 2012

6.3. Planning/Progress: Begin and complete project within 10 years from the date of issuance of investment certificates.

 

7. Searching expectation for foreign partners

- Special requirement to foreign partners: Calling for foreign investors that having the real financial capacity, technology, modern technology, environmentally friendly and have the experience, capacity to implement projects of urban planning, transport infrastructure message.

- Requirement of co-operation form: capital sponsor, co-operation, technology transfer, join venture with local investments.

 

8. Project location information

8.1. Location

- Specify location:

+ South East adjacent An Ha channel.

+ West, Southwest adjacent Long An province; Tân Thới Nhì commune, Hóc Môn district

+ North adjacent Thầy Cai channel.

- Area relation:

- National road 22 passed by, considered the main road to some province near HCMC such as: Tây Ninh, Long An, Bình Dương, Đồng Nai and Phnom Penh capital (Cambodia).

- Thầy Cai and An Hạ channels are waterway transportation that having important meaning.

-  The project is far from HCMC downtown, Tân Sơn Nhất Airport about 25km.

8.2. Land statement

- Kind of land: agricultural land mainly.

- Clearance Status: Completed inventory of compensation, the upward Jun/2012 began paying compensation and land acquisition.

8.3. Electricity

- Electricity supply:

- 96 stations with a capacity 25.823KVA are on Tan Thoi Nhi commune

- Medium voltage lines: 27,7 km.

- Low voltage lines: 27,3 km.

- Lighting : 592 lamps

-  Percentage  of  household  using  electricity  : 100%.

- All people in the communes are provided electricity for daily life, production and business

... electrical system in the commune to ensure technical requirements of the electricity sector. Percentage of households regularly uses electrical safety from the source of 99%.

- Currently due to the demand for electricity for daily use and production much, so in high season the electricity generally weak , needs to increase capacity, install additional substations to meet the needs of people and installations more power lines along the route has been upgraded and opened new production development, serving the population’s living area.

8.4. Water

Water supply projects: there are 02 water supply stations in Nhị Tân 2 and Tân Lập Hamlets, with water supply capacity is about 700 households using.  Households using  safe  sanitary  water:

6.571/6.571 reached (100%), which has 680 households with water supply plants, 5,891 households using well water drilling groundwater. Annually water sampling tests have not detected infections

8.5. Communication service

- Ready services : Telephone, fax, post office, Internet.

- All hamlets having 19.500 cellphone/24.662 people,  3.500  desk  phone/6.571  household. Total computer is 2.500 PC, internet connected is

1.500 PC. Communication of relatively favorable economic base to meet the needs of enterprises and people, people with access to modern facilities and extended such as internet quite easily.

8.6. Traffic

- Statement: Tân Thới Nhì commune having national road 22 pass-by. Transportation network in the commune increasingly be upgraded, expanded current total of communal roads is 146 lines, overall length: 47.7 km. Of which:

+ Main and, inter-communal route: 19.4 km_11 routes; has been asphalted: 8.1 km, reaching rates of 41.9%.

+ Main and, inter-Hamlet route: 10.4 km_ 21 routes; has been asphalted: 4.1 km, reaching rates of 39.4%.

+ The internal routes of hamlet: 9.7 km_108 routes. Has been solidified and not muddy in the rainy season: 3.2 km, reaching rates of 33%.

+ The inland route: 8.2 km_06 routes. 6.5 km has been solidified, reaching 79.3% rate.

- Main transportation: motor bike.

8.7. Waste disposal systems / wastewater

-  Solid  waste  is  collected and handled according to regulations. In the commune there is 01 team with 09 members’ responsibility of waste collection and treatment, mean of waste collection: 8 motor tricycles. How it works: collecting waste in residential areas to the transit yard. The rate of household registration for waste treatment is up to 60%.

- Waste water discharged into the environment to meet the demand, accounting for 87%. However, in the commune there are some farmers and business have not complied with the regulations on waste discharge

- The rate of production facilities do not meet environmental standards: about 5.8% (10 companies). Currently An Ha, Thay Cai, and Trung Luong channel are being polluted. The cause is the business operations produce wastewater without treatment into the channel, has a great influence to the farming activities of people and polluting the environment. The litter is not strictly placing that leading to serious pollution on channels, affecting surface water source quality.

8.8. Human resource

The ability of workers supply: Total number of people between the ages of the commune is 16,812 people (accounting for 68.16% of the population). In which 8495 women (accounting for 50.52%), 8316 male (accounting for 49.48% rate). Total employed labor is 15,997 workers accounting for 95.15% of people in working age.

 

9. Incentives policy/ project condition

Business tax exemption for goods imported in accordance with the Law on Export Tax, Import duties 45/2005/QH11 of June 14, 2005 and Decree No. 149/2005/ND-CP of December 6 / 2005 of the Government detailing the implementation of the Law on export Tax, Import Tax.

 

10. Licensing procedures for investment, construction and project implementation: Having been granted an investment certificate number 411043000651.