PROJECTS IN TAN PHU DISTRICT
Projects on Tan Binh Industrial zone residental areas, Thoai Ngoc Hau - Hoa Binh- To Hieu Complex, Luy Ban Bich - Au Co- Tan Thanh complex areas, and other residental and trading areas of Tan Phu district. |
Project 1: Thoai Ngoc Hau- Hoa Binh –To Hieu Complex -Location: Hiep Tan Ward, Tan Phu Dist. -Objective: to improve economic, cultural, social development of the area -Project scale: + Investment capital: VND 4,800billion + Total land area: 17.2 ha + Estimated number of inhabitants: 28,200 -Functional sections: + Apartment, commercial area, hospital, school, culture and information center, residential area + Internal roads, greenery and public area -Construction standard: + Construction rate: 33% + level of construction: 18 floors with basements + Height of construction: maximum 60m -Current condition: + Master plan 1/500, + Existing large factories, a few houses and unoccupied land area + Technical infrastructure: available -Form of investment: bidding or BT, BOT or BTO
Project 2: Luy Ban Bich- Au Co –Tan Thanh Complex Area -Location: Tan Thanh ward, Tan Phu Dist. -Objective: to improve economic, cultural, social development of the area -Project scale: + Investment capital: VND 6,500billion + Total land area: 22.28ha + Estimated number of inhabitants: 24,300 -Functional sections: + Commercial center, supermarket, offices, high-rise apartment building, residential area… + Internal roads, greenery and public area -Construction standard: + construction rate: under 40% + level of construction: 15 floors (not basements included) + height of construction: maximum 53m -Current condition: + master plan 1/500, + existing large factories, storages and residential houses + Technical infrastructure: available -Form of investment: bidding or BT, BOT or BTO
Project 3: Office building for lease, apartment, and serviced department store -Location: Phu Tho Hoa Ward, Tan Phu District -Scale of project: 1.3 hectare. -Current condition: Technical traffic Vocational School 3 (Transport School 3). Contiguous zones: Its East and South-East are adjacent to Van Cao Street, the south is adjacent to Phu Tho Hoa Street, the west is adjacent to residential area and the existing alleys; the north and northeast are adjacent to Le Thuc Hoach street. Land under planning education land (according QHCT 1 / 2000 Phu Tho Hoa Ward in Decision date 31/12/2008 3958/of Peo- ple’s Committee of Tan Phu district)
Project 4: Apartment and Outlet Mall -Location: Tan Thoi Hoa Ward, Tan Phu District -Scale of project: 9-hectare -Current condition: not yet determined the specific boundaries. Planning under mixed land (according QHCT 1 / 2000 in Tan Thoi Hoa Ward Decision date 31/12/2008 3963/QD- District Tan Phu People’s Committee). Setting up project investors: the People’s Committee of Tan Phu district.
Project 5: Trading center, condominium in Tan Phu District Location: Tay Thanh Ward, Tan Phu District Area: 8.96 ha Objective: Status: agricultural land of citizens (vacant land); among 3rd and 4th graded houses (downgrading sta- tus); without degraded infrastructure, almost not having a Certificate of Land Use. The land is now under Tan Binh Industrial Zone.
Project 6: Tay Thanh Business and Service complex area Location: Tay Thanh Ward, Tan Phu District Area: 28.4 ha Objective: Giving the conditions for of economic, cultural, social development etc. of the regions. Investment capital: VND 6,600 billion Additional information: Status: plan available (1/2000, 1/500?): Legal documents: not finished, approved plans ratio 1/2000. Population: 20,000 people. Location: Truong Chinh (border length: 60m), Tay Thanh (border length 32m). Infrastructure: Electricity, water and telephone, transportation.
Project 7: Residential area of Tan Binh Industrial Zone Location: Tay Thanh Ward, Tan Phu District Area: 8.96 ha Objective: Giving the conditions for of economic, cultural, social development etc. of the regions. Investment capital: VND 2,250 billion Additional information: Status: plan available (1/2000, 1/500) The People’s Committee of Tan Phu District has ac- cepted the Detailed plan of urban building ratio 1/500 at Decision No. 3325/QĐ-UBND dated 25/11/2008. Location of the land: border with Tay Thanh (32m), Le Trong Tan
Project 8: Residential Area – Trading – Services Center Location: Tan Thoi Hoa Ward, Tan Phu Dist. Total investment area: 9 ha Objective: develop economic, cultural conditions for the area Project Developer: People’s Committee of Tan Phu District Construction division: 17 floors including 2 underground floors, 5 floors for exhibition and 10 floors for building offices for lease
Contact info Project Developer: People’s Committee of Tan Phu District 70A Thoại Ngọc Hau St., Hoa Thanh Ward, Tan Phu District, Ho Chi Minh City, Vietnam Tel: (+84.8) 4088300 - 4088342 Fax: (+84.8) 4088302 E-mail: tanphu@tphcm.gov.vn Contact: Mr. Minh – Vice Manager of Administration & Planning Dept. |